Log: Difference between revisions

From Control Systems Technology Group
Jump to navigation Jump to search
No edit summary
No edit summary
Line 20: Line 20:
|Jesse, Alex, Guus  
|Jesse, Alex, Guus  
|Aquiring of the robot parts and the assembly of the robot swarm  
|Aquiring of the robot parts and the assembly of the robot swarm  
|5 hours
|5 hours each
|-
|-
|05-12-2015
|05-12-2015

Revision as of 15:51, 5 December 2015

Back to: PRE2015_2_Groep1

Date: Student(s): Task: Hours spend:
30-11-2015 Jesse, Alex, Simon and Guus Making a specific planning for the rest of the case and tried to find Harry van de Loo in order to ask about the availability of the mindstorm robots. 2 hours each (=8 hours total)
30-11-2015 Simon Working on the first simulation (top level) 3 hours
04-12-2015 Jesse, Alex, Guus Aquiring of the robot parts and the assembly of the robot swarm 5 hours each
05-12-2015 Simon Analysing the texts from [Liu B Chen P Wang G], [Qi G Song P Li K] and [Nicolis S Detrain C Demolin D Deneubourg J] to compose a swarm algorithm for the top level simulation. Also work on the simulation itself. 3 hours