Embedded Motion Control 2014 Group 1/Meeting 20140512: Difference between revisions

From Control Systems Technology Group
Jump to navigation Jump to search
(Created page with 'Meeting 2 date: 12-05-2014 The chosen software architecture for the maze competition is strong. For the corridor competition it is not possible to get this architecture up and…')
(No difference)

Revision as of 11:27, 26 May 2014

Meeting 2

date: 12-05-2014

The chosen software architecture for the maze competition is strong. For the corridor competition it is not possible to get this architecture up and running. Because of this reason it is chosen to make a single file for the corridor competition.

Tasks:

Sander: Hough Transform Richard: Positioning Joep: Maze Architecture Marc + Wouter: Corridor code