26-Sept-14

From Control Systems Technology Group
Revision as of 12:48, 28 September 2014 by S114552 (talk | contribs) (→‎Agenda)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Go back to Meetings.

Agenda

  1. Opening
  2. The Components
  3. Task Division
  4. Closing

Notulen

  1. Opening - Fre was sick and not present for the meeting
  2. The Components - Luc has already built a mini-chimney from K'nex and said the flap system could be a viable option. Karen then said, why are we being so difficult, elevators exist for this kind of stuff. So from now on, the concept of the chimney will evolve around a chimney. The chimney and sliding doors should now work together to make a functioning transport somehow. The coming weeks collaboration will take place. Same for the package to cubby and cubby to person components.
  3. Task Division - There has been a little redivision of tasks, Each person is now responsible for a component of the system for the next week/week 1/2: Luc will handle the Chimney and Fre will be placed to work on the Cubby to Person. The Test Plan/Build Plan do not have to be made.
  4. Closing - All the technology already exists to design this system, we should be looking for systems similar like luggage sorting systems for airports or distribution center logisitics and scale down somehow.