0LAUK0 PRE2016 3 Groep10 Planning: Difference between revisions

From Control Systems Technology Group
Jump to navigation Jump to search
Line 11: Line 11:
** Presentation 2: February 20, 2017
** Presentation 2: February 20, 2017
** Presentation 3: April 03, 2017
** Presentation 3: April 03, 2017
* End-term evaluation (peer-review)
* Finalize final design
* Finalize Wiki-page


== Milestones ==
== Milestones ==

Revision as of 01:02, 6 March 2017

Planning

Gantt chart

See this link (our Google Sheet) for the latest version:

Gantt Chart Group10.jpg

Deadlines

  • Presentations
    • Presentation 1: February 13, 2017
    • Presentation 2: February 20, 2017
    • Presentation 3: April 03, 2017
  • End-term evaluation (peer-review)
  • Finalize final design
  • Finalize Wiki-page

Milestones

  • Literature study
  • Final design


Deliverables

  • CAD-model:
  • Speech recognition component:
  • Fall detecting component:

These components are integrated into one final deshich will be our physical final deliverable

Task division

The group has been divided into three seperate subgroups, which all independently focusses on different subjects, having their own tasks. This is needed to realize an integrated product of our final design at the end. Therefore, the group has been splitted up in such a way, that the subgroups will take care of the hardware, the software or the information page of our design.

Software

    • Bram
    • Pieter

Hardware

    • Steef
    • Man-Hing

Information page

    • Ken
    • Everyone

Others

Back to homepage