TempoCamiel

From Control Systems Technology Group
Revision as of 12:17, 7 March 2018 by S164358 (talk | contribs)
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

Who's doing what

Week Task Responsible

Week 1
All together:

  • Write introduction
  • Update the wiki(weekly)

Everyone for themselves:

  • Search for sources (10-2)
  • Summarize sources (19-2)

Week 2
All together:

  • Rewrite subsections made in Week 1
  • Make a final RPC list out of the personal ones
  • Combine the concepts in one clear list

Everyone for themselves:

  • specific literature study (Summerize 2 sources pp)
  • Think of RPC's for the landing platform
  • Describe or draw concepts

Week 3

  • Camiel: Set up a survey
  • Werner: Rewrite the RPC's
  • Kobus, Michael and Jasper: Work out and compare concepts

Week 4:
Final concept finished(Who?)
Where are we allowed to build(Who?)
Real materials(Who?)
Prototype materials(Who?)
Electronic system(Arduino?)(Who?)
Make/take Survey(who?)
Update Wiki(Who?)


Plan(mail/ask) a real drone session (who?)
Ordering parts(Like arduino or building materials)(Who?)

Week 5:
Prototype hardware(Who?)
Prototype software(Who?)
Assembling hardware/software(Who?)
Make/take Survey(Who?)
Analysis survey(Who?)
Update Wiki(Who?)


Plan(mail/ask) a real drone session (who?)

Week 6:
Prototype hardware(Who?)
Prototype software(Who?)
Assembling hardware/software(Who?)
Analysis/conclusion survey(Who?)
Update Wiki(Who?)

Week 7: Presentation at Thursday 29-03-2018
Presentation finished(Who?)
Wiki finished(Who?)
Prototype software finished(Who?)
Prototype hardware finished(Who?)
Presenter(Who? 1 or more?)