PRE2015 3 Groep2 log maarten: Difference between revisions

From Control Systems Technology Group
Jump to navigation Jump to search
Line 31: Line 31:
*Describing the test setup used during the research on the autonomous landing phase.
*Describing the test setup used during the research on the autonomous landing phase.
*Processing the result of the second experiment
*Processing the result of the second experiment
== Week 6 ==
*Performing the experiment with two now test subjects
*Looking up the theory of the t-test and p-values
*Perform a t-test on our data and determine the p-values for the described ratings

Revision as of 17:39, 15 March 2016

Logbook of Maarten Vlaswinkel

Week 1

  • Finding background information about drone delivery
  • Writing the scenario

Week 2

  • Finding and local navigation
    • Location of the drone
    • Delivering to a front door which can't be reached
  • Updating the wiki with the information found in week 1 & 2

Week 3

  • Summarizing the information during the previous project
  • Redefining the focus
  • Writing the requirements
  • Meeting after the presentation on monday
  • Extra meeting to redefine our focus and requirements
  • Contacting Duarte Antunes for the use of a real drone (AR Parrot) during the project

Week 4

  • Explaining experiment 2
  • Performing experiment 1
    • Flying the drone
    • Being a test subject
  • Writing an introduction about our project

Week 5

  • Discussing the progression of the project
    • Discussing how the test setup of the autonomous landing research will look like
  • Describing the test setup used during the research on the autonomous landing phase.
  • Processing the result of the second experiment

Week 6

  • Performing the experiment with two now test subjects
  • Looking up the theory of the t-test and p-values
  • Perform a t-test on our data and determine the p-values for the described ratings