PRE2015 1 Groep1: Difference between revisions

From Control Systems Technology Group
Jump to navigation Jump to search
No edit summary
No edit summary
Line 1: Line 1:
__FORCETOC__
__FORCETOC__
Autonomous vehicle company start-up
Autonomous Bus Scheduling System
== Introduction ==
== Introduction ==
This project is intended to deliver a business plan with convincing prototype for autonomous vehicle company start-up.
This project is intended to deliver a design report of autonomous bus scheduling system. The system is aimed to create an efficient passenger flow. It will be able to send extra busses to bus stops that are or are getting too crowded and also the system will choose a shorter route to it’s destination when no passengers are waiting at the coming bus stops. Users can check in at the bus stop or with their mobile phone apps. The scheduling system will then optimize the routes by taking this information into account.  


== Background Study ==
== Background Study ==
Line 9: Line 9:
== Content==
== Content==
'''Business Plan'''
'''Business Plan'''
-Cover page and table of contents
-Executive summary
-Mission statement
-Business description
-Business environment analysis
-SWOT analysis
-Industry background
-Competitor analysis
-Market analysis
-Marketing plan
-Operations plan
-Management summary
-Financial plan
-Attachments and milestones





Revision as of 09:21, 17 September 2015

Autonomous Bus Scheduling System

Introduction

This project is intended to deliver a design report of autonomous bus scheduling system. The system is aimed to create an efficient passenger flow. It will be able to send extra busses to bus stops that are or are getting too crowded and also the system will choose a shorter route to it’s destination when no passengers are waiting at the coming bus stops. Users can check in at the bus stop or with their mobile phone apps. The scheduling system will then optimize the routes by taking this information into account.

Background Study

to be done...

Content

Business Plan


Presentation

-First Presentation

-Second Presentation

-Final Presentation


Prototype

-Setup

-Demonstration


Working Log

-Week 1

-Week 2

-Week 3

-Week 4

-Week 5

-Week 6

-Week 7


Team

0856925 Kasper Bakker

0772418 Frank van Heeswijk

0853336 Yuanlong Li

0856593 Eric Steenhof

0844791 Joey Verest

0859523 Eric Wolters


Others