Log: Difference between revisions

From Control Systems Technology Group
Jump to navigation Jump to search
No edit summary
No edit summary
 
(40 intermediate revisions by 5 users not shown)
Line 16: Line 16:
|Working on the first simulation (top level)
|Working on the first simulation (top level)
|3 hours
|3 hours
|-
|31-11-2015
|Chris
|Working on simulation
|3 hours
|-
|03-12-2015
|Chris
|Working on simulation and literature research
|4 hours
|-
|04-12-2015
|Jesse, Alex, Guus
|Aquiring of the robot parts and the assembly of the robot swarm
|5 hours each (=15 hours total)
|-
|05-12-2015
|Simon
|Analysing the texts from  [Liu B Chen P Wang G], [Qi G Song P Li K] and [Nicolis S Detrain C Demolin D Deneubourg J] to compose a swarm algorithm for the top level simulation. Also work on the simulation itself.
|3 hours
|-
|06-12-2015
|Jesse
|Finding out how the [[RCX 2.0]] bricks can be programmed and write a first script to run on for the [[Lego Mindstorms Robots]]
|4 hours
|-
|06-12-2015
|Simon
|Working on the top level simulation
|8 hours
|-
|06-12-2015
|Alex
|Researching and describing the communication possibilities of the robots
|5 hours
|-
|06-12-2015
|Guus
|Worked on robot plus sofware involving the robots, only to find out that the robot i took home was defect. Also wrote the page about [[Windows emulator]].
|5 hours
|-
|09-12-2015
|Jesse, Alex
|Meeting with Mrs. Barakova and acquiring of the new NXT models.
|1 hour each (= 2 hours total)
|-
|10-12-2015
|Jesse, Guus, Chris, Alex
|Building the new robots
|4 hours each (= 16 hours total)
|-
|12-12-2015
|Guus
|Setting up software and assisted on writing the code for [[search algorithm for the pathing]].
|5 hours
|-
|21-12-2015
|Simon
|Working on the simulation and the path updating
|5 hours
|-
|22-12-2015
|Guus
|Programming the new robots, using the [[useful forum links for programming]]
|5 hours
|-
|29-12-2015
|Guus, Alex
|Programming the new robots, using the [[useful forum links for programming]]
|4 hours each (= 8 hours in total)
|-
|04-01-2016
|Alex, Jesse, Chris, Simon and Guus
|Worked on the live demo for the [[final scenario]] with the [[NXT Robots]] and on the [[simulation]]
|4 hours each (= 20 hours in total)
|-
|05-01-2016
|Alex, Jesse, Chris, Simon and Guus
|Worked on the live demo for the [[final scenario]] with the [[NXT Robots]] and on the [[simulation]]
|5 hours each (= 25 hours in total)
|-
|06-01-2016
|Alex, Jesse, Chris, Simon and Guus
|Worked on the live demo for the [[final scenario]] with the [[NXT Robots]] and on the [[simulation]]
|5 hours each (= 25 hours in total)
|-
|07-01-2016
|Alex, Jesse, Chris and Simon
|Worked on the live demo for the [[final scenario]] with the [[NXT Robots]] and on the [[simulation]]
|4 hours each (= 16 hours in total)
|-
|08-01-2016
|Alex, Jesse, Chris and Simon
|Worked on the live demo for the [[final scenario]] with the [[NXT Robots]] and on the [[simulation]]
|5 hours each (= 20 hours in total)
|-
|09-01-2016
|Alex, Jesse, Chris and Simon
|Worked on the live demo for the [[final scenario]] with the [[NXT Robots]] and on the [[simulation]]
|6 hours each (= 24 hours in total)
|-
|10-01-2016
|Alex, Jesse, Chris and Simon
|Worked on the live demo for the [[final scenario]] with the [[NXT Robots]] and on the [[simulation]]
|8 hours each (= 32 hours in total)
|-
|11-01-2016
|Simon
|Worked on getting a .gif file from the simulation
|1/2 hour
|-
|13-01-2016
|Guus
|Worked on the wiki
|4 hours
|-
|13-01-2016
|Alex
|Worked on the wiki
|2 hours
|-
|14-01-2016
|Simon
|Worked on gathering results from the simulation
|5 hours
|-
|15-01-2016
|Simon
|Worked on setting up the tools for plotting graphs from the simulation
|6 hours
|-
|16-01-2016
|Guus
|Worked on the wiki
|5 hours
|-
|16-01-2016
|Simon
|Worked on investigating the influence of different USE aspects on the efficiency of the rescue operation
|5 hours
|-
|17-01-2016
|Guus
|Worked on the wiki
|5 hours
|-
|17-01-2016
|Alex
|Worked on the wiki
|6 hours
|-
|17-01-2016
|Jesse
|Worked on the wiki
|4 hours
|-
|17-01-2016
|Simon
|Make graphs, analyse data and work on the wiki
|10 hours
|}
|}

Latest revision as of 04:03, 18 January 2016

Back to: PRE2015_2_Groep1

Date: Student(s): Task: Hours spend:
30-11-2015 Jesse, Alex, Simon and Guus Making a specific planning for the rest of the case and tried to find Harry van de Loo in order to ask about the availability of the mindstorm robots. 2 hours each (=8 hours total)
30-11-2015 Simon Working on the first simulation (top level) 3 hours
31-11-2015 Chris Working on simulation 3 hours
03-12-2015 Chris Working on simulation and literature research 4 hours
04-12-2015 Jesse, Alex, Guus Aquiring of the robot parts and the assembly of the robot swarm 5 hours each (=15 hours total)
05-12-2015 Simon Analysing the texts from [Liu B Chen P Wang G], [Qi G Song P Li K] and [Nicolis S Detrain C Demolin D Deneubourg J] to compose a swarm algorithm for the top level simulation. Also work on the simulation itself. 3 hours
06-12-2015 Jesse Finding out how the RCX 2.0 bricks can be programmed and write a first script to run on for the Lego Mindstorms Robots 4 hours
06-12-2015 Simon Working on the top level simulation 8 hours
06-12-2015 Alex Researching and describing the communication possibilities of the robots 5 hours
06-12-2015 Guus Worked on robot plus sofware involving the robots, only to find out that the robot i took home was defect. Also wrote the page about Windows emulator. 5 hours
09-12-2015 Jesse, Alex Meeting with Mrs. Barakova and acquiring of the new NXT models. 1 hour each (= 2 hours total)
10-12-2015 Jesse, Guus, Chris, Alex Building the new robots 4 hours each (= 16 hours total)
12-12-2015 Guus Setting up software and assisted on writing the code for search algorithm for the pathing. 5 hours
21-12-2015 Simon Working on the simulation and the path updating 5 hours
22-12-2015 Guus Programming the new robots, using the useful forum links for programming 5 hours
29-12-2015 Guus, Alex Programming the new robots, using the useful forum links for programming 4 hours each (= 8 hours in total)
04-01-2016 Alex, Jesse, Chris, Simon and Guus Worked on the live demo for the final scenario with the NXT Robots and on the simulation 4 hours each (= 20 hours in total)
05-01-2016 Alex, Jesse, Chris, Simon and Guus Worked on the live demo for the final scenario with the NXT Robots and on the simulation 5 hours each (= 25 hours in total)
06-01-2016 Alex, Jesse, Chris, Simon and Guus Worked on the live demo for the final scenario with the NXT Robots and on the simulation 5 hours each (= 25 hours in total)
07-01-2016 Alex, Jesse, Chris and Simon Worked on the live demo for the final scenario with the NXT Robots and on the simulation 4 hours each (= 16 hours in total)
08-01-2016 Alex, Jesse, Chris and Simon Worked on the live demo for the final scenario with the NXT Robots and on the simulation 5 hours each (= 20 hours in total)
09-01-2016 Alex, Jesse, Chris and Simon Worked on the live demo for the final scenario with the NXT Robots and on the simulation 6 hours each (= 24 hours in total)
10-01-2016 Alex, Jesse, Chris and Simon Worked on the live demo for the final scenario with the NXT Robots and on the simulation 8 hours each (= 32 hours in total)
11-01-2016 Simon Worked on getting a .gif file from the simulation 1/2 hour
13-01-2016 Guus Worked on the wiki 4 hours
13-01-2016 Alex Worked on the wiki 2 hours
14-01-2016 Simon Worked on gathering results from the simulation 5 hours
15-01-2016 Simon Worked on setting up the tools for plotting graphs from the simulation 6 hours
16-01-2016 Guus Worked on the wiki 5 hours
16-01-2016 Simon Worked on investigating the influence of different USE aspects on the efficiency of the rescue operation 5 hours
17-01-2016 Guus Worked on the wiki 5 hours
17-01-2016 Alex Worked on the wiki 6 hours
17-01-2016 Jesse Worked on the wiki 4 hours
17-01-2016 Simon Make graphs, analyse data and work on the wiki 10 hours