Log

From Control Systems Technology Group

(Difference between revisions)
Jump to: navigation, search
Line 26: Line 26:
|Analysing the texts from  [Liu B Chen P Wang G], [Qi G Song P Li K] and [Nicolis S Detrain C Demolin D Deneubourg J] to compose a swarm algorithm for the top level simulation. Also work on the simulation itself.  
|Analysing the texts from  [Liu B Chen P Wang G], [Qi G Song P Li K] and [Nicolis S Detrain C Demolin D Deneubourg J] to compose a swarm algorithm for the top level simulation. Also work on the simulation itself.  
|3 hours
|3 hours
 +
|-
 +
|06-12-2015
 +
|Jesse
 +
|Finding out how the [[RCX 2.0]] bricks can be programmed and write a first script to run on for the [[Lego mindstorm]]
 +
|4 hours
 +
|-
|}
|}

Revision as of 14:45, 6 December 2015

Back to: PRE2015_2_Groep1

Date: Student(s): Task: Hours spend:
30-11-2015 Jesse, Alex, Simon and Guus Making a specific planning for the rest of the case and tried to find Harry van de Loo in order to ask about the availability of the mindstorm robots. 2 hours each (=8 hours total)
30-11-2015 Simon Working on the first simulation (top level) 3 hours
04-12-2015 Jesse, Alex, Guus Aquiring of the robot parts and the assembly of the robot swarm 5 hours each (=15 hours total)
05-12-2015 Simon Analysing the texts from [Liu B Chen P Wang G], [Qi G Song P Li K] and [Nicolis S Detrain C Demolin D Deneubourg J] to compose a swarm algorithm for the top level simulation. Also work on the simulation itself. 3 hours
06-12-2015 Jesse Finding out how the RCX 2.0 bricks can be programmed and write a first script to run on for the Lego mindstorm 4 hours
Personal tools