Group2 19-1 Week4: Difference between revisions

From Control Systems Technology Group
Jump to navigation Jump to search
No edit summary
No edit summary
Line 28: Line 28:
*Communication options via fiber or alternative options (Kasper)
*Communication options via fiber or alternative options (Kasper)


[[File:Water_Phase_Diagram.jpg|frame|right|Phase diagram of water]]
[[File:Water_Phase_Diagram.JPG|frame|right|Phase diagram of water]]




[[PRE2019_1_Group2|Back to the main page]]
[[PRE2019_1_Group2|Back to the main page]]

Revision as of 13:25, 24 September 2019

Back to the main page

Notes tutor meeting

  • Make requirements measurable
  • Subdivide requirements
  • Requirements, preferences and constraints
  • Wie gaat het maken? Andere groep stakeholders/gebruikers
  • Expand explanation for translation to exoplanets
  • Nut van de achievements van de missie
  • Wiki hoeft pas klaar te zijn na de presentatie, dus week 8
  • Keuze voor experimenten moet echt gemaakt worden, deze week eigenlijk nog'
  • Of we in een beschaving mogen/kunnen komen is een ethisch vraagstuk waar we wat meer op in moeten gaan
  • Conclusies gaan trekken over constraints en keuzes
  • Hoe zeker is er een oceaan op Europa, onze afweging moet duidelijk zijn voordat we ingaan op een cryobot sturen
  • Planning weer updaten (week 5 report -> andere tijdsbesteding)
  • Modelleren/berekenen
  • Anthropologische deontologie
  • Zekerheid oceaan

Voor donderdag:

  • Requirements updaten (zie notes Tijn)(Wouter)
  • Modelletje temperatuur (Wouter)
  • Hoe omgaan met beschavingen (Wouter)
  • Experimenten updaten (Marco)
  • Planning updaten (Marco)
  • Aanwezigheid oceaan bevestigen (Kasper)
  • Fiber optic cable at 100 K (Marco)
  • Communication options via fiber or alternative options (Kasper)
Phase diagram of water


Back to the main page