Embedded Motion Control 2017 Group 5 Meetings Overview

From Control Systems Technology Group
Revision as of 17:28, 20 June 2017 by S169530 (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

Meeting 1 (12-5-2017)

Reviewed initial concept design with tutor.

  • Team needs to think more on software architecture (components, functions, flows).
  • Current architecture diagrams are not explicit enough.
  • Agreed to meet next week to discuss findings and prepare first presentation.

    Meeting 2 (16-05-2017)

    Discussed initial design and prepared presentation.

  • Presentation will be made.
  • Information flows need to be specified.
  • Code the corridor challenge in pairs (Sjoerd & Bart, Rodrigo & Kagan, Angel & Torben).

    Meeting 3 (19-05-2017)

    Discussed corridor challenge progress.

  • Focus on framework, easier to discuss if we are more specific.
  • Think carefully on what we need/want to test (some parameters) Simulation vs Real.
  • Code the corridor challenge separately, in pairs Sjoerd & Bart (world model) , Rodrigo & Kagan (Motion Controller), Angel & Torben (Action Manager).

    Meeting 4 (29-05-2017)

    Define testing plan.

  • Tuesday, Turning 90° degrees with odometry, turn based on the laserdata, collect realtime data for worldmodel tests and tuning potential field (Angel, Sjoerd, Kagan, Bart) .
  • Wednesday, Everything not done on Tuesday, smoothing turnings, potential field with set point (Kagan, Rodrigo, Bart)
  • Use pythagoras, check for corner detection.

    Meeting 5 (02-06-2017)

    Discussed corridor challenge result and progress.

  • Things that go well (Potential field, detecting the gap and stopping in the right spot).
  • Things that didn't go well (Didn't stop after turning, due to time delays).
  • We are not using time delay anymore, we go back to odometry data.
  • First advance for Pledge algorithm (PICO got into a loop).
  • There's a problem while sticking to a wall when moving.

    Meeting 6 (12-06-2017)

    Discussed final presentation and maze challenge.

  • Tutor had no complaints about final presentation.
  • New function for align PICO and stay parallel to walls.
  • Integration of all functionalities tested, except for left and right doors (To test on tuesday).

    Meeting 7 (20-06-2017)

    Discuss the Wiki page.

  • Still mising some points.
  • Update functionality and system hierarchy.
  • Update IBD and add description.
  • Add figures and unused functions.
  • Merge corridor challenges explanations.