- | == | + | == Meeting 1 (12-5-2017) == |
- | + | Reviewed initial concept design with tutor. | |
- | + | <li>Team needs to think more on software architecture (components, functions, flows). | |
- | < | + | <li>Current architecture diagrams are not explicit enough. |
- | < | + | <li>Agreed to meet next week to discuss findings and prepare first presentation. |
- | < | + | |
- | |||
- | |||
- | |||
- | |||
- | |||
- | + | == Meeting 2 (16-05-2017) == | |
- | + | Discussed initial design and prepared presentation. | |
- | < | + | <li>Presentation will be made. |
- | < | + | <li>Information flows need to be specified. |
- | < | + | <li>Code the corridor challenge in pairs (Sjoerd & Bart, Rodrigo & Kagan, Angel & Torben). |
- | |||
- | |||
- | |||
- | |||
- | |||
- | + | == Meeting 3 (19-05-2017) == | |
- | + | Discussed corridor challenge progress. | |
- | + | ||
- | + | ||
- | + | ||
- | < | + | <li>Focus on framework, easier to discuss if we are more specific. |
- | < | + | <li>Think carefully on what we need/want to test (some parameters) Simulation vs Real. |
- | < | + | <li>Code the corridor challenge separately, in pairs Sjoerd & Bart (world model) , Rodrigo & Kagan (Motion Controller), Angel & Torben (Action Manager). |
- | + | ||
- | + | ||
- | |||
- | |||
- | |||
- | |||
- | |||
- | + | == Meeting 4 (29-05-2017) == | |
- | + | Define testing plan. | |
- | + | ||
- | + | ||
- | + | ||
- | < | + | <li>Tuesday, Turning 90° degrees with odometry, turn based on the laserdata, collect realtime data for worldmodel tests and tuning potential field (Angel, Sjoerd, Kagan, Bart) . |
- | < | + | <li>Wednesday, Everything not done on Tuesday, smoothing turnings, potential field with set point (Kagan, Rodrigo, Bart) |
+ | <li>Use pythagoras, check for corner detection. | ||
- | |||
- | == | + | == Meeting 5 (02-06-2017) == |
+ | Discussed corridor challenge result and progress. | ||
- | + | <li>Things that go well (Potential field, detecting the gap and stopping in the right spot). | |
+ | <li>Things that didn't go well (Didn't stop after turning, due to time delays). | ||
+ | <li>We are not using time delay anymore, we go back to odometry data. | ||
+ | <li>First advance for Pledge algorithm (PICO got into a loop). | ||
+ | <li>There's a problem while sticking to a wall when moving. | ||
- | |||
- | + | == Meeting 6 (12-06-2017) == | |
+ | Discussed final presentation and maze challenge. | ||
+ | |||
+ | <li>Tutor had no complaints about final presentation. | ||
+ | <li>New function for align PICO and stay parallel to walls. | ||
+ | <li>Integration of all functionalities tested, except for left and right doors (To test on tuesday). | ||
+ | |||
+ | |||
+ | == Meeting 7 (20-06-2017) == | ||
+ | Discuss the Wiki page. | ||
+ | |||
+ | <li>Still mising some points. | ||
+ | <li>Update functionality and system hierarchy. | ||
+ | <li>Update IBD and add description. | ||
+ | <li>Add figures and unused functions. | ||
+ | <li>Merge corridor challenges explanations. |
Current revision as of 15:28, 20 June 2017
Contents |
Meeting 1 (12-5-2017)
Reviewed initial concept design with tutor.
Meeting 2 (16-05-2017)
Discussed initial design and prepared presentation.
Meeting 3 (19-05-2017)
Discussed corridor challenge progress.
Meeting 4 (29-05-2017)
Define testing plan.
Meeting 5 (02-06-2017)
Discussed corridor challenge result and progress.
Meeting 6 (12-06-2017)
Discussed final presentation and maze challenge.
Meeting 7 (20-06-2017)
Discuss the Wiki page.