Embedded Motion Control 2013 Group 1: Difference between revisions

From Control Systems Technology Group
Jump to navigation Jump to search
Line 54: Line 54:
== Meetings ==
== Meetings ==


[[Embedded_Motion_Control_2013_Group_1/Meeting_20130904|Meeting - 2013-09-04]]
# [[Embedded_Motion_Control_2013_Group_1/Meeting_20130904|Meeting - 2013-09-04]]
 
# [[Embedded_Motion_Control_2013_Group_1/Meeting_20130911|Meeting - 2013-09-11]]
[[Embedded_Motion_Control_2013_Group_1/Meeting_20130911|Meeting - 2013-09-11]]


== (Global) Planning ==  
== (Global) Planning ==  

Revision as of 12:34, 11 September 2013

Group Info

Name: Abbr: Student id: Email:
Groupmembers (email all)
Paul Raijmakers PR 0792801 p.a.raijmakers@student.tue.nl
Pieter Aerts PA 0821027 p.j.m.aerts@student.tue.nl
Wouter Geelen WG 0744855 w.geelen@student.tue.nl
Frank Horstenbach FH 0792390 f.g.h.hochstenbach@student.tue.nl
Niels Koenraad NK 0825990 n.j.g.koenraad@student.tue.nl
Tutor
Jos Elfring n.a. n.a. j.elfring@tue.nl

Meetings

  1. Meeting - 2013-09-04
  2. Meeting - 2013-09-11

(Global) Planning

Week 1 (2013-09-02 - 2013-09-08)

  • Installing Ubuntu 12.04
  • Installing ROS Fuerte
  • Following tutorials on C++ and ROS.
  • Setup SVN

Week 2 (2013-09-09 - 2013-09-15)

  • Discuss about splitting up the team by 2 groups (2,3) or 3 groups (2,2,1) to whom tasks can be appointed to.
  • Create 2D map using the laser scanner.
  • Start working on trying to detect walls with laser scanner.
  • Start working on position control of Jazz (within walls i.e. riding straight ahead, turning i.e. 90 degrees).
  • Start thinking about what kind of strategies we can use/implement to solve the maze (see usefull links).

Week 3 (2013-09-16 - 2013-09-22)

  • Start work on trying to detect openings in walls.
  • Start working on code for corridor competition.
  • Continue thinking about maze solving strategy.

Week 4 (2013-09-23 - 2013-09-29)

  • Decide which maze solving strategy we are going to use/implement.

Week 5 (2013-09-30 - 2013-10-06)

  • To be determined.

Week 6 (2013-10-07 - 2013-10-13)

  • To be determined.

Week 7 (2013-10-14 - 2013-10-20)

  • To be determined.

Week 8 (2013-10-21 - 2013-10-27)

  • To be determined.

Progress

Week 1

Theory

Usefull links