0LAUK0 2015 01 Week6: Difference between revisions

From Control Systems Technology Group
Jump to navigation Jump to search
 
(6 intermediate revisions by 4 users not shown)
Line 30: Line 30:
|}
|}
'''Week 6''': 05-10-15
'''Week 6''': 05-10-15
= Meetings =
== Monday ==
== Thursday ==
= Plan =


= Progress =
= Progress =
Line 43: Line 36:


== Frank van Heeswijk ==
== Frank van Heeswijk ==
 
This week I have worked on understanding the code for the simulation, but I have not been able to make extensions to the simulation. Li needed to make some changes to the simulation which he did in the weekend and then I should be able to continue, but Saturday evening I got sick and was not able to finish it in time.


== Yuanlong Li ==
== Yuanlong Li ==
Line 55: Line 48:


-Added general happiness
-Added general happiness
TODO:
-Make the routes and lines configurable from UI? probably xml or something similar so don't have to modify the code to add new lines and routes
-Add support for exporting result data to Excel


== Eric Steenhof ==
== Eric Steenhof ==
Line 67: Line 53:


== Joey Verest ==
== Joey Verest ==
I continued with the past and current attempts. I also made the return of the bus route with Eric S, so Li can implement it in the simulation. And i also started to make the report look good. I started with putting everything in Latex.


== Eric Wolters ==
== Eric Wolters ==


This week wasn't the most productive for me.
I finished the survey analysis and added the some things to adress the comments we got back from the feedback session.
Furthermore i made a start with writing some text for the simulation part of the report. However Li and Frank will finish it since they know the most about the simulation


== Lester Jones ==
== Lester Jones ==
https://www.dropbox.com/s/o29nd3jpdeer72d/EndReport0LAUK0conceptphase.pdf?dl=0
In this link the current state of the report can be found


Started with the past & current attempts.
Started with the past & current attempts.

Latest revision as of 10:47, 22 October 2015

Quick Links
Home
Content Plan Report Simulation
Log Week1 Week2 Week3 Week4 Week5 Week6 Week7

Week 6: 05-10-15

Progress

Kasper Bakker

Frank van Heeswijk

This week I have worked on understanding the code for the simulation, but I have not been able to make extensions to the simulation. Li needed to make some changes to the simulation which he did in the weekend and then I should be able to continue, but Saturday evening I got sick and was not able to finish it in time.

Yuanlong Li

Didn't spent too much time working on the project this week.

-Changed the simulator a bit to make it work with multiple lines. Now we have two lines running in simulator.

-Added a very basic configuration interface

-Added some documentation for the code

-Added general happiness

Eric Steenhof

Joey Verest

I continued with the past and current attempts. I also made the return of the bus route with Eric S, so Li can implement it in the simulation. And i also started to make the report look good. I started with putting everything in Latex.

Eric Wolters

This week wasn't the most productive for me. I finished the survey analysis and added the some things to adress the comments we got back from the feedback session. Furthermore i made a start with writing some text for the simulation part of the report. However Li and Frank will finish it since they know the most about the simulation

Lester Jones

https://www.dropbox.com/s/o29nd3jpdeer72d/EndReport0LAUK0conceptphase.pdf?dl=0 In this link the current state of the report can be found


Started with the past & current attempts.