Week 4: 21-09-15

Meetings

Monday

To find measurable quantities Li will look into literature to find good waiting time quantities. The requirements should be better defined. Kasper, Lester and Eric S will work on the introduction and objectives part of the report. While they will do this they can easily also elaborate more on the requirements and explain why our system is an improvement on the current system. Frank and Li will start on the basic set up of the simulation so that we can start on it as soon as possible. The survey should also be done this week and Eric W and Joey will organize it and organize the data. Everyone will conduct some surveys to distribute the workload. There is still some work to do on the literature studies so we will still work on this.

Thursday

Plan

Progress

Kasper Bakker

Frank van Heeswijk

Yuanlong Li

-Added requirements for Introduction Part

Eric Steenhof

Public transportation has been around for a couple of decades now. It started with the stagecoach in the nineteenth century. Later on came the steam trains which were capable of carry large capacity of people at the same time. The trains were too big to travel in city themselfs, so the tram was invented. However not city are capable of creating a tramrail network. So with the increasing demands of mobility in the sixties, busses started to be used for public transportation in cities around the Netherlands and the rest of europe. Bus stops were created around cities and a static scheduling system was implemented. This static scheduling system uses a fixed time table around the city. The busses follow fixed routes each time and do not take into account if there are any people waiting at a bus stop or not. Meaning that the busses do not take a shorter route when nobody is willing to stop of is waiting a certain bus stop. This means it is time for a dynamic system, this will be the main focus in this report. The new scheduling system for busses aims to create a more efficient passenger flow. It will be able to send extra busses to bus stops that are or are getting too crowded and also the system will choose a shorter route to it’s destination when no passengers are waiting at the coming bus stops. Users can check in at the bus stop or with their mobile phone apps. The scheduling system will then optimize the routes by taking this information into account. A small part of the report will discusses the possibility of using autonomous busses in the new dynamic scheduling system, analyzing the impact of user, society and enterprise. Different approaches can be used to optimize this schedule. Those will be analyzed and take feedback data from a survey. This data will be inputted in a simulation in order to analyze the consequence of the different needs of the users. Furthermore in this report the infrastructure will be redesigned. The most important infrastructure alteration will be the placement of the bus depot. The simulation will also be used to validate the new dynamic scheduling system. The validation will have with different requirement like waiting time and crowdiness but also with happiness. This is a design report for dynamic schedualing bus system, incoreperating the needs of the User, Society and Entreprise.

Joey Verest

Eric Wolters

Lester Jones

- Write the approach - Some more study regarding the USE-aspects